CABLE CRANE SYSTEM, ZURICH OERLIKON DURCHMESSERBAU

CABLE CRANE SYSTEM, ZURICH OERLIKON DURCHMESSERBAU

altmann-projekt-featured-oerlikon

Project Data

Year: 2012
Client Arge Porr-Walo
Location: Zurich, Switzerland
Task: Complete installation and planning of a cable crane system.

Project Description

During the redevelopment of the train station Zurich Oerlikon, Heinz Altmann AG installed a cable crane system, which was operated between the running trains. Via the material cableway, concrete work for new tracks could be completed, whilst at the same time enabling the tracks to continue operating. The cable crane system had a cargo load of 5 tonnes and a length of 450 m. As the cableway was installed in a residential area with little space available, a special supporting structure was installed in order to guarantee the highest security possible.

Project Gallery

ADDITIONAL PROJECTS

Here you can get some impressions and information of further projects that were completed by Altmann in the cableway industry and forestry.

Do you like our execution of projects?
Please contact us for a non-binding offer!