MATERIAL CABLEWAY OBERVERMUNTWERK II

Material Cableway Obervermuntwerk II

altmann-projekt-featured-obervermunr

Project Data

Year: 2014
Client LCS Cable Cranes
Location: Montafon, Austria
Task: Installation of a 20-tonne material cableway

Project Description

With regards to the construction of the pumped storage plant in Montafon, Austria, Altmann installed a heavy-duty material cableway for LCS Cable Cranes, specialist for material cableways. The cableway supplied the large construction site at lake Vermunt at 1,700 meters above sea level with construction materials and constructions machines for 4 years during the winter months. The material cableway with circulation engine was almost 3,000 meters long, overcoming an altitude difference of almost 700 meters.